![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/2fba5e0439902c28979cde5988b5cf0f_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
![ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck. ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.](https://www.iconeng.com.au/image/c0af88c1fe62d7d0f29f2fc0345dd4bf_960_600_cropped.jpg)
ICON Engineering - ICON works in with operators and support contractors to ensure well test equipment is adequately restrained on deck.
Derrick Cranes Specialized Application Cranes For Sale in SYDNEY, NEW SOUTH WALES, Australia - 1 Listings | MarketBook Canada
![JMSE | Free Full-Text | Review on Fixed and Floating Offshore Structures. Part II: Sustainable Design Approaches and Project Management JMSE | Free Full-Text | Review on Fixed and Floating Offshore Structures. Part II: Sustainable Design Approaches and Project Management](https://pub.mdpi-res.com/jmse/jmse-10-00973/article_deploy/html/images/jmse-10-00973-g008.png?1658730568)
JMSE | Free Full-Text | Review on Fixed and Floating Offshore Structures. Part II: Sustainable Design Approaches and Project Management
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img4.jpg)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![US8312828B2 - Preloading to reduce loads and save steel on topsides and grillage of catamaran systems - Google Patents US8312828B2 - Preloading to reduce loads and save steel on topsides and grillage of catamaran systems - Google Patents](https://patentimages.storage.googleapis.com/f4/47/cb/ee10fb62edc92c/US08312828-20121120-D00000.png)
US8312828B2 - Preloading to reduce loads and save steel on topsides and grillage of catamaran systems - Google Patents
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-gabs-1200x498.webp)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica](https://static-01.extrica.com/articles/23344/23344-img7.jpg)
Study on the fatigue performance of steel-composite grillage deck of large-span arch bridge - Extrica
![Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from Electric railway journal . te, were erected witha standard 75-ton wrecking derrick, fitted with a special 90-ft.boom capable of lifting either the steel or concrete poles ata point 90 ft. from](https://c8.alamy.com/comp/2CRAHRT/electric-railway-journal-te-were-erected-witha-standard-75-ton-wrecking-derrick-fitted-with-a-special-90-ftboom-capable-of-lifting-either-the-steel-or-concrete-poles-ata-point-90-ft-from-the-center-of-the-track-the-concretepoles-were-lifted-from-the-cars-on-which-they-were-loadedand-placed-on-timber-horses-adjacent-to-the-excavation-wherethey-were-to-be-set-the-cross-arms-and-grillage-were-thenput-in-place-and-the-pole-thus-equipped-was-picked-up-at-thetop-and-lowered-into-the-excavation-the-steel-poles-werepicked-up-from-the-embankment-where-they-had-been-un-loaded-and-lifted-2CRAHRT.jpg)